Security Link SL150 Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Sicherheitszugriffskontrollsysteme Security Link SL150 herunter. Security Link SL150 Installation manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - WWW.ALLOMATIC.NET

®UL325compliantcompliantUL991LISTED®USSL-100DC & SL-150DC Installation ManualCopyright © 2008 all-o-matic inc. www.allomatic.net WWW.ALLOMATIC.NET

Seite 2 - TABLE OF CONTENTS

9GATE TRAVEL ADJUSTMENTFOR SL-150DCLocate limit switch box.Step 1: Make sure operator is not running .Step 2: Use a screw driver to pull limit lock pl

Seite 3 - To reduce the risk of

10Right hand and left hand opening is from behind the operator.OPENING DIRECTION SETTINGSOpeningOpening0210OOUURRNN338866BBSS331133OOUURRNN338866BBSS3

Seite 4 - THE FOLLOWING:

11230V230V115V115VGRDLINE 1LINE 2All gate operators be properly grounded.A proper ground in a gate operator installation minimizes or prevents damage

Seite 5 - DIFFERENT UL 325 CLASS TYPES

1/4 IN1/4 IN1 1/2 INSAFETY LOOPWHEN USEDEXIT LOOP4 FT 4 FT8 FT8 FT4 FT4 FT4 FTGATE OPERATORGATEGATE TRACKTWISTED 6 TURNS PER FOOTWIRED IN SERIESThis

Seite 6 - FOR SL-100DC

The following loop installation guidelines are for installing typical driveway loops for access control applications (i.e. parking gates, sliding gate

Seite 7

14CCPowerPowerDetectDetectLoop FailLoop FailResetReset22110000SENS.SENS.LEVELLEVELBOOST ONBOOST ONPULSEPULSEFREQ.FREQ.0000OFFOFFPRESPRES221111 22 33 4

Seite 8

15SAFETY LoopdetectorPHOTO BeamRelay (N.C.)MULTIPLE SAFETY DEVICES CONNECTIONSMultiple devices installed together must be connected in series . th

Seite 9

This is a loop . Remember when connecting to an All-O-Matic circuit board from loop detector theYou must twist your wires from your exit point of

Seite 10 - FOR SL-150DC

17LEADING EDGE CONNECTIONLEADING EDGE SENSORConnect one of the wires from leading edge and/or one of the grey wires from a wireless edge receiver to

Seite 11 - OPENING DIRECTION SETTINGS

18N.C.COMTHREE BUTTON STATIONSYSTEMConnect the from all the push buttonsto input on the board.Connect push button contact toinput on the board.C

Seite 12 - ELECTRICAL CONNECTION

TABLE OF CONTENTSImportant safety instructions...Different UL 325 class types...

Seite 13 - TYPICAL LOOP LAYOUT

19MASTER/SLAVE CONNECTIONUse a two wire shielded cable and run it through a UL listed conduit for master/slave connection. Follow the wiring diagram

Seite 14 - 1/4’’ Feeder Slot

20MEICAGN TL KOCSOLENOIDLOCKStep DownTransformerMAGNETIC/SOLENOID LOCK CONNECTIONSMagnetic lock installation requires a step down transformer with app

Seite 15 - ACCESSORY CONNECTIONS

21RADIO RECEIVER CONNECTIONS3 wire receiver: mounts on receiver strip outside control box as shown below.4 wire receiver: connect the two relay wires

Seite 16 - MULTIPLE SAFETY DEVICES

22OPEN AND CLOSE ELECTRONIC REVERSING SENSOR(ERDs) ADJUSTMENTMAX MAXMIN MINSENSITIVITYCounter clockwise maximumsensitivityClockwise minimum sensitivit

Seite 17 - LPR-1 LOOP RACK INATALLATION

231 2 3 4 5 6 7 81 2 3 4 5 6 7 8-----------------------OPEN-------------------------------------------

Seite 18 - LEADING EDGE CONNECTION

24DIP SWITCH FUNCTIONSTIMERTIMER switch “ON” activates the TIMER. See page 21 for details.RADIORADIO switch “ON” allows the radio receiver to override

Seite 19 - THREE BUTTON STATION

25SOLAR PANEL CONNECTIONDR127-33043CL07 EC8RBL4MC68 AI2 M12214202300206 40100120M10101001MAAFS21B802360GBONOOUURRNN338866BBSS331133OOUURRNN338866BBSS3

Seite 20 - MASTER/SLAVE CONNECTION

LED DIAGNOSTICSAC/PWR ON: Will be lit when AC power is ON.M/S LINK: Will be lit when master/slave communication is active.ALARM: Two states.1st state:

Seite 21 - Transformer

EMERGENCY RELEASEProcedures to release gate for .1. Turn power OFF.2. Push pedal down & move pedal slightly to the left to hold pedal down in

Seite 23 - ADJUSTMENT

IMPORTANT SAFETY INSTRUCTIONSTo reduce the risk of WARNINGinjury:READ THE FOLLOWING DIRECTIONS. DO NOT EVEN THINK OF STARTING UNTIL YOU HAVE READ AN

Seite 24 - TIMER ADJUSTMENT

*Confirm that the gate operator being installed is appropriate for the application.*Confirm that the gate is designed and built according to current p

Seite 25 - DIP SWITCH FUNCTIONS

Class one: ResidentialA vehicle gate operator intended for use at a home of one to four single family dwellings, garages or parking area.Class Two: Co

Seite 26 - SOLAR PANEL CONNECTION

523½”23 ”½4”6.5”CONCRETE PAD PLACEMENTFOR SL-100DC24”24”9½”9½”24”24”10”10” RED HEAD BOLTSFOUR PLACES ½”X 3 ½” Area for conduit(s) Operator concrete pa

Seite 27 - LED DIAGNOSTICS

6CONCRETE PAD PLACEMENTFOR SL-150DC24”24”16.25”16.25”30”30”7.5”7.5”FOUR RED HEAD BOLTS ½”X 3 ½” Area for conduit(s) GATE TRACK GATEGATE TRACKFOOTINGMi

Seite 28 - EMERGENCY RELEASE

7Rear mount installation and chain layoutA front mount installation and chain layoutDRIVEWAYDRIVEWAYDIFFERENT INSTALL CONFIGURATIONSGate in open posit

Seite 29

8Gear boxGATE TRAVEL ADJUSTMENTFOR SL-100DCLimit nut lock plateLimit nutsLocate limit switchesStep 1: Stop the gate operator using the three button st

Kommentare zu diesen Handbüchern

Keine Kommentare